

1 Drill hole into masonry using a 16mm masonry drill. Hole must be a minimum of 65mm deep.
Maximum fixture thickness 50mm.
2 Push bolt into hole flush with surface and place fixture over projecting bolt.
3 Locate washer and nut onto bolt and tighten nut. Full expansion should be achieved within 3–4 turns. Bolt may be cut to length if required.
